chips4sle
Well-known member
Yes, I am double posting this...
It got moved to the "restricted" section and I do not know how often that gets visited.
Sorry if I offend anyone
Here is the much anticipated BERZERK Joystick reproduction…
**The handle is Aluminum & Powder Coated Black. The Shaft is Steel.
The Joystick (handle/shaft) is $75 plus shipping.
**It will fit into a Happ Controls Perfect 360 Joystick base. No hole for the roll pin. That was an additional cost that we did not think was necessary.
Those can be ordered from us for an additional $85 plus shipping.
**Wood control panel bottom to work with Joystick / control panel, comes with the T-Nuts, is $20 plus shipping.
All of this will work with cnlmoore's control panels.
We will need a minimum order of 75 joysticks to make the project. If we do not hit 75, any pre-payments will be refunded.
We will be taking pre-orders until Sunday, June 10, 2012. If we hit 75, then the project will take approx. 30-45 days to complete.
Attached is a picture of the prototype joystick.
Any questions can be directed to: [email protected]
Please email or PM your order and will send you an invoice.
Thanks…
(wood picture stolen from retroactive )
It got moved to the "restricted" section and I do not know how often that gets visited.
Sorry if I offend anyone
Here is the much anticipated BERZERK Joystick reproduction…
**The handle is Aluminum & Powder Coated Black. The Shaft is Steel.
The Joystick (handle/shaft) is $75 plus shipping.
**It will fit into a Happ Controls Perfect 360 Joystick base. No hole for the roll pin. That was an additional cost that we did not think was necessary.
Those can be ordered from us for an additional $85 plus shipping.
**Wood control panel bottom to work with Joystick / control panel, comes with the T-Nuts, is $20 plus shipping.
All of this will work with cnlmoore's control panels.
We will need a minimum order of 75 joysticks to make the project. If we do not hit 75, any pre-payments will be refunded.
We will be taking pre-orders until Sunday, June 10, 2012. If we hit 75, then the project will take approx. 30-45 days to complete.
Attached is a picture of the prototype joystick.
Any questions can be directed to: [email protected]
Please email or PM your order and will send you an invoice.
Thanks…
(wood picture stolen from retroactive )
