Pre Order Pheonix Arcade Control Panel & CPO!!

Wow almost there and my money is funny till Sept 10th payday. Just giving a heads up in advance. Rock on!
 
I'm in for one cp and overlay for sure - depending on time-frame I might be in for two.

I'll keep tabs on this and wait for an update on the ETA.
 
CP only

I already have a MW CPO from Darin for this project.

Can you make the joystick bolts for this project long enough?

I want to be able to bolt a piece of wood underneath so that the spacing is correct as if I used an original wood control panel. I also don't want to use button spacers. I think it would be a nice way to get it similar to the original control panels.

Here's Mine ready for a new CP. It was too much work to move the joysticks. I am already running the JROK board in a JAMMA converted (not me) Robotron.

attachment.php
 

Attachments

  • robotron.jpg
    robotron.jpg
    64.2 KB · Views: 361
Last edited:
Got back some info for the time frame. It would take 2-3 weeks for production and about another week to get to me. So lets assume 4 weeks before shipping them out. I hope this helps with all you "sitting on the fence"
 
I already have a MW CPO from Darin for this project.

Can you make the joystick bolts for this project long enough?

I want to be able to bolt a piece of wood underneath so that the spacing is correct as if I used an original wood control panel. I also don't want to use button spacers. I think it would be a nice way to get it similar to the original control panels.

Here's Mine ready for a new CP. It was too much work to move the joysticks. I am already running the JROK board in a JAMMA converted (not me) Robotron.

attachment.php

Not sure that would work?? The new panel would have to be bigger to fit the wood panel??
 
[
I'm in for one cp and overlay for sure - depending on time-frame I might be in for two.

I'll keep tabs on this and wait for an update on the ETA.
Time frame looks great - so add me in for the second for sure. Didn't see me listed on the 'committed to buy' list for the first one but add me again for the second.
 
[
Time frame looks great - so add me in for the second for sure. Didn't see me listed on the 'committed to buy' list for the first one but add me again for the second.

List has been updated! You guys know anyone else interested? It's getting close but it seems to have died down in interest. If I can get a few more this week I will probably start taking deposits this weekend and getting the template to the manufacturer.
 
I would be in for 1 panel. I already have the CPO.
 
Almost there ..... 25 is the minimum to get this done ...... The more the merrier!! I'm waiting for some clarification from some people. I'll give payment info tomorrow or Friday at the latest.

-Jim
 
Back
Top Bottom