I recently made a deal to buy an operators monitor hoard. It was supposed to be 100 complete pieces. It ended up being 60 something, but still a lot to haul.
With a 3 and a half hour trip one way, I needed to do it in as few trips as possible. So I came up with a plan. Rather than use my 16 foot open trailer, I would rent a Uhaul like I usually do.
A simple plan and works perfect. I cut 2x4's the width of the trailer and laid them on the side boards of the interior walls. Next I cut OSB for the floor. And wham-bam...levels. The first pics are of Uhaul model AV and the last an RV.
Hope this is helpful to someone.
With a 3 and a half hour trip one way, I needed to do it in as few trips as possible. So I came up with a plan. Rather than use my 16 foot open trailer, I would rent a Uhaul like I usually do.
A simple plan and works perfect. I cut 2x4's the width of the trailer and laid them on the side boards of the interior walls. Next I cut OSB for the floor. And wham-bam...levels. The first pics are of Uhaul model AV and the last an RV.
Hope this is helpful to someone.