Shredder565
Member
Well, here's what we've determined so far :
Second TRansformer removed since it's no longer in use.
Confirmed first transformer is operational
Confirmed fuses are operational.
If I'm remembering my engineer talk correctly, It's not getting power from somewhere. The noly thing we have to determine next, I guess, is the Power Supply working? Can that be done with the same equipment?
I sent him the plans mentioned in an earllier thread and schematics, but he claims that even when blown up, the writing on it is tough to impossible to read. If anyone has a clear image schematic of the Transformers, most appreciated
Second TRansformer removed since it's no longer in use.
Confirmed first transformer is operational
Confirmed fuses are operational.
If I'm remembering my engineer talk correctly, It's not getting power from somewhere. The noly thing we have to determine next, I guess, is the Power Supply working? Can that be done with the same equipment?
I sent him the plans mentioned in an earllier thread and schematics, but he claims that even when blown up, the writing on it is tough to impossible to read. If anyone has a clear image schematic of the Transformers, most appreciated