Just a little update for now 
I was able to test fit the CP in a Defender cab (thanks Tubular!), everything lined up pretty well as expected. As mentioned, there are a couple small tweaks I'll be doing for production...but at this point I feel is a go.
My plan is by end of this week I will have final numbers on cost and production time. I have been in touch with Rich at This Old Game, so looks like I'll be offering a combo w/CPO as well for those that may want both.
I'll link a new thread here with pricing and schedule. FYI - I will not be doing any pre-pay on these. I'll be fronting cost and doing production based on feedback. I'll only charge when packed and ready to ship out. My preliminary goal is to try and get 20 people wanting these, but most likely need at least 10 to put green light on production. I'll be shooting for getting 20ish panels on the 'will buy' list hopefully by mid-December, then have ready to ship by mid-January.
Here is a pic of test fit:
Woot!
-GackAttack
I was able to test fit the CP in a Defender cab (thanks Tubular!), everything lined up pretty well as expected. As mentioned, there are a couple small tweaks I'll be doing for production...but at this point I feel is a go.
My plan is by end of this week I will have final numbers on cost and production time. I have been in touch with Rich at This Old Game, so looks like I'll be offering a combo w/CPO as well for those that may want both.
I'll link a new thread here with pricing and schedule. FYI - I will not be doing any pre-pay on these. I'll be fronting cost and doing production based on feedback. I'll only charge when packed and ready to ship out. My preliminary goal is to try and get 20 people wanting these, but most likely need at least 10 to put green light on production. I'll be shooting for getting 20ish panels on the 'will buy' list hopefully by mid-December, then have ready to ship by mid-January.
Here is a pic of test fit:
Woot!
-GackAttack