Kalamath
New member
Thinking I'll do some laminated plywood layers; fiberglass roving soaked in System 3 epoxy resin between 7/8th plywood. Outer layer will be skinned in 3/4" live oak planking. 3/4" thick marquee & front glass/bezel made from Lexan. Quarter inch welded plate for the CP.
Not sure what to do with joysticks. Need 1/2" shafts...3/8" are too skinny.
Once it's built up it'll be affixed to the concrete sub-floor with some burly 5/8" studs, epoxied into the slab, and bolted down.
Once I have my baby all set it'll be <so cool>, cause then I can keep a baseball bat handy to BEAT THE FUCK out of the god damn thing! I may even put a likeness of Eugene on top as a target, for creating such a monstrously beautiful game.
No, I haven't been drinking. Yet.
Not sure what to do with joysticks. Need 1/2" shafts...3/8" are too skinny.
Once it's built up it'll be affixed to the concrete sub-floor with some burly 5/8" studs, epoxied into the slab, and bolted down.
Once I have my baby all set it'll be <so cool>, cause then I can keep a baseball bat handy to BEAT THE FUCK out of the god damn thing! I may even put a likeness of Eugene on top as a target, for creating such a monstrously beautiful game.
No, I haven't been drinking. Yet.


